»´ä³¥¥~©w¦VÁ`·|
2000/2001
¦~«×§Þ³N(¦a¹Ï)©eû·|²Ä¤@¦¸·|ij°O¿ý
¤é´Á
: ¤G¹s¹s¹s¦~¤E¤ë¥|¤é(¬P´Á¤@)¦aÂI
: »´ä«C¦~¼úÀyp¹ºÁ`³¡®É¶¡
: ±ß¤W¤C®É¤T¤Q¤À¥X®u
: ·¨°ê±j §Þ³N¯µ®Ñ°Ï´¼±j
VOC¾H¶§©Û »´ä©w¦V¶V³¥·|
§f¥[¼Ö §B¼Ö¥aÂ@
±ç´¼ùÚ «C¶i³¥¥~©w¦V·|
¼B¥Ã³Ç µ£x³¥¥~©w¦V·|
§d©[¦¨ »´ä³¥¥~©w¦V·|
Áé§Ó©ú ¦PªÀ
§dª÷´I »´ä«C¦~¼úÀyp¹º
¤@ ³q¹L¤W¦¸·|ij°O¿ý
1.1 »P·|ªÌ¤@P³q¹L¤W¦¸·|ij°O¿ý¡C
¤G ¸ò¶i¨Æ¶µ
¤T °ª¯Å¦a¹Ï»s§@¯Z
¡@
¥| ·|ijµ²§ô
¡@
¡@
Orienteering Association of Hong Kong
Minutes of the First Technical Committee on Mapping 2000/2001
Held on 4 September 2000, 7:30pm at HKAYP Headquarters
Present : Mr. Yeung Kwok Keung Technical Secretary
Mr. Au Chi Keung VOC
Mr. Tang Yeung Chiu HKOXCC
Mr. Lui Ka Lok C&P
Mr. Liang Chi Hang YAOC
Mr. Lau Wing Kit SOC
Mr. Ng Kwan Shing HKOC
Mr. Chung Chi Ming AKIN
Mr. Ng Kam Fu AYP
Item 1 Confirmation of Last Meeting Minutes
1.1 The minutes of last meeting was confirmed without amendment.
Item 2 Matters Arising
2.1 TS reported that Mr. Lau Kin Kwok and Mr. Wong Man Chu had agreed to give their old maps and information to OAHK. TS also tabled his old maps at the meeting.
Item 3 Advance Mapping Clinic
3.1 TS reported that YAOC had submitted their comments on Base Maps to OAHK but they still did not submit the Agreement on the Guideline for the Use of Base Maps.
3.2 Mr. Patrick Ng had prepared a form on the Brief Report on Photogrammetric Base Maps to be distributed to the respective clubs for completion and fax back to OAHK within this week, which would be submitted to HKSDB together with the evaluation report of Advance Mapping Clinic.
3.3 General discussion took place in the meeting with respect to the quality and problem of five base maps.
3.4 Since there still was excess amount of subsidies on the production of base maps, meeting agreed to give the total cost of base map to AKIN. AKIN would confirm with SE whether they could receive the amount.
3.5 Meeting proposed that those five clubs could submit to OAHK the dates of field works and the name of coach-in-charge to claim the lecturers_ fees. TS would confirm with SE.
3.6 Regarding the giving of maps 500 pcs to OAHK as stated in the Guidelines for the Use of Base Map, TS would further clarify with SE.
3.7 The meeting agreed that the actual production cost of map should be stated in the evaluation report as the production cost of each map was around HK$30.
Item 4 End of Meeting
4.1 There being no further business, the meeting was adjourned at 2130 hours. The next meeting would be held on 30 October 2000 at AYP headquarters. All clubs were advised to send representatives to the meeting.
¡@